Performance against forecasted budget is an essential reporting requirement. The main costs for a project will come under two headings: resources and assets. The control activities around costs are very much linked to the controls around time as the time required from the resources represents significant costs.

Rod Sowden in full flow
Listen up guys

If this is an area that you are interested in finding out more about, why not have a look at our guidance page and example technique