{"id":3321,"date":"2020-08-03T08:30:06","date_gmt":"2020-08-03T07:30:06","guid":{"rendered":"https:\/\/aspireeurope.wordpress.com\/?p=3321"},"modified":"2020-05-07T12:45:59","modified_gmt":"2020-05-07T11:45:59","slug":"fresh-look-dependency-management-2","status":"publish","type":"post","link":"https:\/\/aspireeurope.com\/blog\/2020\/08\/03\/fresh-look-dependency-management-2\/","title":{"rendered":"What is programme dependency management ?"},"content":{"rendered":"<p>We thought it would be a good idea to revisit some of the guiding principles that underpin the world of portfolio, programme and project management.&nbsp;In a world of information overload it is very easy to lose sight of what matters.<br \/>\nDependency Management really is one of the Dark Arts. It&nbsp; about the interfaces between initiatives. At a programme level it is what planning is all about, tracking how the inputs and the outputs of projects fits together. At the portfolio level it is even more complex as it is matching together inputs and outputs from programmes and projects.<br \/>\nIn MSP\u00ae 2011 we introduced the concepts of Intra, Inter and External dependencies so here is the <a href=\"https:\/\/dev.aspireeurope.com\/blog\/wp-content\/uploads\/2017\/10\/msp-sound-bites-dependency-management-unmasked.pdf\" target=\"_blank\" rel=\"noopener\">paper<\/a> that defined the original concept and explains how they operate in a programme management environment.<\/p>\n<h6>MSP\u00ae is a [registered] trade mark of AXELOS Limited, used under permission of AXELOS Limited. All rights reserved.<\/h6>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-2423 size-full\" src=\"https:\/\/dev.aspireeurope.com\/blog\/wp-content\/uploads\/2016\/08\/aspire-logo.gif\" alt=\"aspire-logo\" width=\"120\" height=\"96\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We thought it would be a good idea to revisit some of the guiding principles that underpin the world of portfolio, programme and project management.&nbsp;In a world of information overload it is very easy to lose sight of what matters. Dependency Management really is one of the Dark Arts. It&nbsp; about the interfaces between initiatives. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,18],"tags":[127,137,194,230,246,263],"_links":{"self":[{"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/posts\/3321"}],"collection":[{"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/comments?post=3321"}],"version-history":[{"count":2,"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/posts\/3321\/revisions"}],"predecessor-version":[{"id":4025,"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/posts\/3321\/revisions\/4025"}],"wp:attachment":[{"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/media?parent=3321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/categories?post=3321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aspireeurope.com\/blog\/wp-json\/wp\/v2\/tags?post=3321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}